Hydraulic tower
Many needs, all the right answers.
Works: 19 m high Hydraulic Tower
Location: Guidonia, Rome
Project features: the main obstacle was represented by the various construction methods required for the pier and tank, which required customized products and procedures. The pier was built using the MR 250 climbing system and MECCANO formwork. The conical tank was constructed using the MECCANO system resting on ORTHOPLUS shoring. Having completed the calyx, the crown was done using the MIDIPLUS ROUND system.
The various techniques for plywood bending, fixing the reusable plywood from the back, the manifold number of standard accessories and the factory assembly all represented important preconditions for the perfect execution of the works.









